The lower side stringers upto frame 8 are fitted each side

The front frames from 9 trough 15 need the backing strips fitted before we can tack them in forming the front of the boat.
today we managed to get 6 frames completed and 4 frames remain.
src="https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEgJwxXuoyeJPxZ6N1cR9UeP2O5-PG-KrWCuvDKT_p52oRiW2xg8_b0eqesr00UxOenmyTQT6DsW8GMf5AVBt1GlyzA9PY3_eJfvUtoTXQGGgo299GNYH8W_OMNkvyhkPoAt1jsCbv7NtTg_/s320/27-29-11-2007+010.jpg" style="CURSOR: hand">
Backing strips welded to the inside of the frames.
there is a radius of 150mm approx.. we used the gas bottle to form it perfectly...!

Frame 13 assembled (in darkness) ready for the backing strip
Backing strips welded to the inside of the frames.
there is a radius of 150mm approx.. we used the gas bottle to form it perfectly...!

Frame 13 assembled (in darkness) ready for the backing strip