Tampilkan postingan dengan label moving. Tampilkan semua postingan
Tampilkan postingan dengan label moving. Tampilkan semua postingan

Selasa, 18 Oktober 2016

Moving forward

29th Nov 2007

The lower side stringers upto frame 8 are fitted each side


The front frames from 9 trough 15 need the backing strips fitted before we can tack them in forming the front of the boat.
today we managed to get 6 frames completed and 4 frames remain.


Backing strips welded to the inside of the frames.
there is a radius of 150mm approx.. we used the gas bottle to form it perfectly...!


Frame 13 assembled (in darkness) ready for the backing strip
Read More..

Minggu, 12 Juni 2016

Moving Day


Moved in with Ramon at the opposite end of our little dirt lane, said hello and goodbye to friends, and fought tarantulas. Not too much boat work getting done around here.
Read More..
 
About Boat Plans - Powered By Blogger