Kamis, 24 November 2016

Progress Again

I now have all the steering system hydraulics fitted.  Flow and return pipes have been run from the steering pump to the ram and with the help of my wife turing the wheel to order the system was filled and bled. Here is the helm pump.  I have removed the wheel again as its sure to get damaged.


I have also fitted the an external 13a socket, the 16a power inlet, 12v switch panel, locker doors and the red bit is the megga loud alarm sounder.

Sam the canopy maker came again today to start the final fit.  This has enabled me to finally get the big tempory cover off.  Whist it has done a stirling job the constant noise of it russtling in the wind has really irritted me. So..........


Before

And the big reveal...........


After

 Panoramic shot front

 Panoramic shot front

Sams Website  
I have a comment from an email corrispondent about the pram hood:-"The dogs Bollocks"  guess he didnt want to put it in the comments box. I aggree.  I will show it off on another blog later on as to what it does.

While Sam and indeed his daughter Sam were fitting  this I was bust up the front end.  I have removed the horible steel front doors and replaced them with the loverly oak ones I had made.


Before



After
The grind marks are to remove the hinge

Finally today another delivery of furnature to finish off the kitchen and for the bedroom.  Once again it feels like things are moving again.
Its strange how it goes, you seem to be working and nothing seems to get done, then in a couple of days all the prep comes together in a big way.

Sam is back on Friday to put the final fittings on the cover.

Read More..

Minggu, 23 Oktober 2016

Progress finally

15th December 07

Well finally our busy week is nearly over, on Friday 14th, the guys managed to finish tackwelding FR 12 and F13 to the hull floor. Also the stiffeners on FR 1-3 lower sections were fitted having been sitting there for a week waiting to get fitted.

Today Saturday, I managed to finish the last big frame, No 14. (below)



Side stringers laid into approx positions. Bottom Stringers (longitudionals ) all in there correct place and level to the floor. We did have a major kink to work around on the LSH where the sheets are joined. The centre beam ahead of the last frame is also fitted to allow FR 14 to get placed.