Floor Laying

Earlier in the week I did some finishing work on the sliding hatch.  More on that later.

Over the last few days I have started fitting the flooring.  We have chosen laminate flooring as it is very durable, attractive, stable, and easy to replace in time.  Modern Laminate is IMO better than real wood in appearance.  The one we have chosen for the lounge is a thicker than normal.  Its 12mm not the normal 6-8mm and a good textured surface with enough grip for our aged dog.  I have used a 5mm HD foam underlay for a bit of extra insulation, it also has a foil layer supposedly to reflect heat back up.

Before

After

This is a far as I go for the time being.  The rest will be laid once the boat is afloat.  I need access under the floor to add ballast to trim the boat.

Of course in the kitchen nothing other than Sicilian Slate could be used.  OK, its expensive but boy does it look good especially now its oiled.

Before

After

Other jobs done are some work in the bedroom on the ceiling and making the steps to the bow doors, and dressing the stern entrace to the boat.


You will notice all the wires. Im redoing this as I wernt happy with the appearence.

In fact I have a lot of small jobs on the go, but noting complete enough to be blog worthy ATM.

Read More..

Senin, 13 Juni 2016

The floor

Friday 9th November

Progress has been held up for 3 days as we couldnt get a frontloader to hire.
with only 3 people around it was impossible to lift the sheets.

We used the Truck as a flat surface to Tack the sheets of the floor together.
With no sides, we loaded from one side and unloaded from the other.


Assembling the sheets on the only flat surface I have.



The sheets were then lifted through the truck onto the hull jig.


The 2 Aft sheets layed onto the jig.




3 of 4 sections layed in.




Last piece being added.

Under the cover of darkness and lack of camera on the same day we lined up the sheets and tackwelded the aft ones together.

As you can imagine, it looked like it would never line up and form a good shape as a boat rather than apile of scrap metal. !




Read More..

Sabtu, 30 April 2016

Finished raised floor

Part of an update,
Pics taken 11th March 09.

Finished new floor height



Centre Girders back in place



New Cut in 1st step to aft cabin, now there will be 4 steps instead of 3 and will be better



Aft Bulkhead getting reinforcing box to carry aft wall


Other side.
Once this was in I re -attached new 50mm angles to the aft wall and cut out the lower origional ones