The Beginning

Saturday 3rd November 2007

I have 2 days off in a mad time at work. 8 am sees me outside trying to sift trough the piles to sort it out,

The first thing I did was to get the fuel tanks inside and coated with WD40 as I wont need them till March-08. I got as much done but having nobody else or the Frontloader I needed but couldnt get, I have to get more help next week.

I started on the Jigs for the boat. These will be welded to the RSJ frame to shape and support the boat.



style="CURSOR: hand">
Dara oversees the accuracy.



David helps with the assembly







6PM and 2 frames done and an hour later sees the 3rd one done.

PS. Anybody got a small crane for a week or 2.!